MANUAL – III

Procedures followed in decision – making process

 

 

Sl. No.

Activity

Level of action

Time frame

1.

Preparation of Master Plan

1.      Collection of village sheets

2.      Collection of Data & its processing, preparation of report.

3.      Preparation of Map

4.      Preparation of cadastral sheets, colouring of maps and other maps as required in Master Plan Report.

5.      Other Development Plan

 

Amin

 

Technical Asst. / Investigator

 

Draftsman / Tracer

Draftsman / Tracer

As per the programme fixed by the Director of Town Planning, Orissa.